Today

Canson and Engie inaugurate biomass boiler at French paper mill

Canson and Engie have inaugurated a biomass boiler at Canson's paper mill in Saint-Marcel-lès-Annonay, France, designed to cover 89% of the plant's steam needs with renewable energy. The EUR 6m (USD 6.7m) project, contracted in autumn 2023 and commissioned over six months, will consume about 9,000 tonnes of biomass a year and is expected to avoid 50,715 tonnes of CO2 over its ten-year operating contract.

Why this mattersThe project cuts a specialty paper mill's natural gas dependence materially, a template other energy-intensive paper plants may follow to lower carbon and cost exposure.

  • Biomass boiler has 5 MW thermal output and produces 31 GWh of heat a year
  • Investment of nearly EUR 6m (USD 6.7m)
  • Covers 89% of the mill's steam requirements with renewable energy
  • Consumes about 9,000 tonnes of biomass annually, sourced within 100 km
  • Expected to avoid 50,715 tonnes of CO2 over the ten-year operating and maintenance contract
  • Contract signed in autumn 2023; existing 11 MW gas boiler remains as backup
Canson Engie counterparty
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.

Updates

  • 2026-10-15 · Edited before publication: Facts and the EUR conversion are correct. Lowered materiality: a EUR 6m boiler at an art paper mill outside packaging is routine.