Today

CMPC's Natureza pulp mill wins preliminary environmental licence in Brazil

CMPC's proposed Natureza eucalyptus pulp project in Barra do Ribeiro, Brazil, has received a preliminary environmental licence from state regulator Fepam, handed over on 23 October 2026. The BRL 27bn (USD 5.0bn) development would add a new mill with design capacity of 3m tonnes a year of bleached eucalyptus kraft pulp alongside CMPC's existing Guaiba mill, plus a BRL 1.5bn (USD 280m) export terminal at Rio Grande port. The approval only establishes environmental viability; CMPC must still obtain an installation licence before construction can start.

Why this mattersA 3m-tonne greenfield line would add materially to global bleached eucalyptus kraft pulp supply, though CMPC still needs an installation licence before construction can start.

  • Rio Grande do Sul regulator Fepam granted a preliminary environmental licence on 23 October 2026 for CMPC's Natureza pulp project in Barra do Ribeiro
  • Project cost is estimated at BRL 27bn (USD 5.0bn), including BRL 1.5bn (USD 280m) for an export terminal at Rio Grande port
  • Fepam states design capacity of 3m tonnes a year of bleached eucalyptus kraft pulp, up from the 2.5m tonnes previously cited by CMPC
  • CMPC's existing Guaiba mill would continue operating alongside the new plant
  • Projected employment reaches 12,000 at peak construction, falling to about 800 direct and 1,500 contractor roles in operation
  • The preliminary licence confirms environmental viability only; CMPC still needs an installation licence before construction can begin
CMPC
Sources papnews.com
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.

Updates

  • 2026-10-28 · Edited before publication: Grounded; BRL conversions correct. The 'why this matters' line named Suzano, which the source does not mention; rewritten without it.