Today

CurTec USA to invest USD 10m expanding South Carolina plant

CurTec USA will invest USD 10m to expand its Westminster, Oconee County facility, adding warehouse and production line capacity for pharmaceutical-grade drums and pails. The expansion will create 10 jobs and is expected to come online in summer 2027.

Why this mattersThe investment adds US capacity for pharmaceutical-grade rigid plastic packaging, reinforcing onshoring of supply for life-sciences customers.

  • CurTec USA will invest USD 10m to expand its Oconee County, South Carolina operations
  • The expansion creates 10 new jobs
  • Operations are expected online in summer 2027
  • The Westminster facility opened in 2023
  • Expansion adds warehouse and production line capacity for drums and pails for pharmaceutical markets
  • The expansion adds about 2,536 square metres and over 2,000 additional pallet positions
  • Construction begins in October 2026, with completion expected in the second quarter of 2027
  • A new extrusion blow moulding line will enable local production of smaller packaging, including 6- and 10-litre Click Pack buckets in 2026 and smaller wide-mouth drums in 2027
CurTec
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.

Updates

  • 2026-10-10 · Further coverage added: scbio.org
  • 2026-10-10 · Further coverage added: upstatescalliance.com
  • 2026-10-13 · Update: CurTec USA confirms the USD 10m Oconee County expansion will add pharma drum and pail capacity, with start-up still expected by mid-2027.
  • 2026-10-14 · Update: CurTec USA details the Westminster expansion further: construction starts October 2026, adding 2,536 square metres, over 2,000 pallet positions and a new extrusion blow moulding line for smaller containers.