Today

Georgia-Pacific implodes structures at closed Foley Cellulose mill

Georgia-Pacific carried out a controlled implosion on 21 November 2026 at its former Foley Cellulose mill in Taylor County, bringing down three chimney stacks, two recovery boiler precipitators and a gantry crane. The mill, which made fluff pulp for diapers and other products, closed in 2023 with the loss of about 525 jobs. A second and final implosion is planned but undated.

Why this mattersThe demolition confirms Georgia-Pacific will not restart fluff pulp capacity at the site, removing it permanently from the supply base.

  • Implosion took place 21 November 2026 at the former Foley Cellulose mill in Taylor County
  • Structures brought down: three chimney stacks, precipitators for Recovery Boilers No. 2 and No. 3, and a gantry crane
  • Mill closed in 2023, affecting about 525 jobs
  • Mill produced fluff pulp used in diapers and similar products
  • Georgia-Pacific plans a second and final implosion at the site, date not yet announced
Georgia-Pacific
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.

Updates

  • 2026-11-23 · Edited before publication: 'Florida' is not in the source; removed.
  • 2026-11-24 · Further coverage added: packagingnewsdaily.com