Today

New Horizon drops appeal over loss of Welsh plastics PRN accreditations

Welsh plastics reprocessor New Horizon Plastics has withdrawn its appeal against the loss of its packaging reprocessor accreditations, which revert to cancelled status as of 9 December 2026. Natural Resources Wales suspended the accreditations for its two Welsh sites in March and cancelled them in May; the sites reprocessed about 170,000 tonnes of plastic in 2025, an estimated 29% of UK reprocessing capacity, and could have generated about USD 40m (GBP 30m) in PRN revenue. Its permits and sites are understood to be moving to Norven Polymers, a company founded in June 2026.

Why this mattersLosing about 29% of UK plastics reprocessing capacity from the PRN system cuts note supply in an already strained market, raising compliance costs for obligated packaging producers.

  • New Horizon withdrew its appeal; its PRN accreditations revert to cancelled status as of 9 December 2026
  • The two Welsh plastics sites reprocessed about 170,000 tonnes in 2025, up from 120,000 tonnes in 2024
  • The sites accounted for an estimated 29% of UK reprocessing capacity in 2025 and could have generated about USD 40m (GBP 30m) in PRN revenue
  • Natural Resources Wales suspended the accreditations in March 2026 and cancelled them in May 2026
  • NRW is understood to be investigating New Horizon; the nature of the case has not been confirmed
  • Permits and sites are understood to be transferring to Norven Polymers, founded in June 2026
Nhp Group Holdings Limited Norven Polymers counterparty Natural Resources Wales counterparty
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.

Updates

  • 2026-11-17 · Edited before publication: GBP 30m converts to USD 39.6m at 1.3198 but must be rounded to the source's precision: USD 40m. 'Under UK EPR' is not in the source. Summary tightened; the NRW investigation and the founding date of Norven Polymers added from the source.
  • 2026-11-17 · Edited before publication: Grounded; GBP 30m to USD 40m is correct at 1.3198. The summary wrongly said the sites themselves were suspended and cancelled. NRW suspended and cancelled the accreditations for the two sites, so the summary is reworded. Materiality 4 kept: the case affects about 29% of UK plastics reprocessing capacity in an already strained PRN market.