Today

Giurgiu recycled kraft paper mill in Romania 60% built, due to start in 2028

A recycled-fibre kraft paper mill under construction in Giurgiu, Romania, is about 60% built and due to start in 2028, at an estimated cost of EUR 80-90m (USD 89-101m), businessman Vladimir Cohn said. Planned capacity is 120,000-130,000 tonnes a year of kraft paper from recovered paper, aimed at bags that replace plastic in retail; about 60% of output is earmarked for export to other European markets.

Why this mattersThe plant would add Romania's first domestic capacity for recovered-fibre kraft paper used in plastic-replacement bags, supplying both local and export demand.

  • Investment estimated at EUR 80-90m (USD 89-101m)
  • Construction about 60% complete, with completion targeted for 2028
  • Annual capacity planned at 120,000-130,000 tonnes of kraft paper made from recovered paper
  • Expected to create 150-200 jobs
  • About 60% of output earmarked for export to Europe, 40% for the Romanian market
  • Financing is a mix of own funds and bank credit, according to businessman Vladimir Cohn
Giurgiu kraft paper mill
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.

Updates

  • 2026-11-02 · Edited before publication: Conversion error: EUR 90m x 1.1172 = USD 100.5m, which rounds to USD 101m, not 100m. USD conversion also added to the summary, per the publisher's note.