Today

STADLER commissions large lightweight packaging sorting plant for PreZero in Austria

STADLER Anlagenbau has completed and commissioned a lightweight packaging (LVP) sorting facility for PreZero in Sollenau, Austria, described as the largest and most complex system STADLER has delivered to date. The plant is designed to process approximately 104,500 tonnes of lightweight packaging annually across two modules, using 35 near-infrared sorting units from STEINERT and an AI-based battery-detection system.

Why this mattersAdded regional sorting capacity in Austria reduces transport distances and lifts material recovery rates, supporting downstream demand for recycled packaging feedstock in Europe.

  • Facility located in Sollenau, Austria, operated by PreZero
  • Designed capacity of approximately 104,500 tonnes of lightweight packaging per year across two modules
  • Plant uses 35 near-infrared sorting units supplied by STEINERT GmbH
  • Automated baling system can produce up to 20 different output fractions
  • 14 volumetric flow sensors developed by STADLER monitor material flow in real time
  • STADLER delivered the turnkey project on schedule despite installation starting before building halls were complete
STADLER Anlagenbau GmbH PreZero counterparty STEINERT GmbH counterparty
Relevant to you?

Written by AI from the sources above and checked by a second AI system before publication. No human wrote or edited this story. How it is made.